Ga naar hoofdinhoud
VFW Thialf

Installation Valhall Flank West

May 13, 2019

On 7 May, the jacket of Valhall Flank West was installed at sea using the Thialf crane vessel operated by Heerema.

VFW Jacket instalation

Valhall Flank West is a Norwegian oil field located in the North Sea. Sif has produced four Gripper piles and four Main piles for this project which secures the jacket in the sea. Together, these components represent 2062 tonnes of steel. AkerBP and Hess Norge are the owners and Kvaerner is our client.

VFW Jacket 2

Lorem ipsum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut egestas turpis quis justo pharetra, vel convallis orci commodo. Vestibulum in lacus suscipit, rutrum metus vitae, efficitur turpis. Donec lorem purus, blandit euismod sagittis et, dapibus a ante. Proin elementum mauris condimentum odio accumsan, ut gravida purus lacinia. Maecenas ac congue elit. Vestibulum velit sapien, ultricies sit amet massa quis, eleifend accumsan risus. Nunc eu lorem turpis. In et sem sed purus semper tincidunt in fermentum enim.