Ga naar hoofdinhoud
Tyra

Sif wins new project: Tyra

Jul 11, 2018

Dragados Offshore from Spain and Sif Netherlands b.v. have signed a contract for the supply of legs, caissons, and piles for the two jackets of the Tyra Future Development Project. Both jackets will be installed in the Danish part of the North Sea, 225 km west of Esbjerg. Together they contain more than 10 Kton of steel, while the piles contain 8 Kton of steel.

The jackets have a height of 70 metres and have a footprint of 52 x 30 metres and 32 x 30 metres respectively. Dragados Offshore is the PC contractor for the two new TEG & TEH jackets of the project.

Lorem ipsum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut egestas turpis quis justo pharetra, vel convallis orci commodo. Vestibulum in lacus suscipit, rutrum metus vitae, efficitur turpis. Donec lorem purus, blandit euismod sagittis et, dapibus a ante. Proin elementum mauris condimentum odio accumsan, ut gravida purus lacinia. Maecenas ac congue elit. Vestibulum velit sapien, ultricies sit amet massa quis, eleifend accumsan risus. Nunc eu lorem turpis. In et sem sed purus semper tincidunt in fermentum enim.